Software for Engineers

Skip Navigation LinksEngenious > StormShed2G > 2G Online Tutorial > Step By Step 1 > Step By Step 3
Skip Navigation Links
Home
StormShed2G
2GNote
Feature List
2G Documentation
2G Online TutorialExpand 2G Online Tutorial
StormShed3G
Whats New
3GDocsExpand 3GDocs
Video Training
Installation
HSPF ToolKit
ToolKit Introduction
ToolKit Features
ToolKit Requirements
ToolKit Installation
Using a Black Box?
Video Training
Misc Product InfoExpand Misc Product Info
Technical
WSDOT Tech Note 3
FAQ
Licensing
Pricing
Updates
Contact
Server Status

Simple Detention 3

Now that the drainage areas have been defined, we can define the storage element. This tutorial will use a trapezoidal pond. If you haven't done so, Press the OK button in the Basin Dialog to close the drainage area dialog.

Expose the PROTOTYPE record under the Nodes Category and right mouse click on it to bring up the Node dialog.
When the PROTOTYPE record appears, immediately press the New Node button and this time change the autolabel to trap. Press OK.

Change the node type from whatever it is currently set to Trap Pond. Set the Start El to 100 ft and the Max El to 108 ft. When finished, select the Trap Pond tab that appeared when the Trap Pond button was selected.

Enter the data shown in the trap Pond and press Close to close the dialog.
Previous Tutorial Continue with Tutorial
Page Maintained by Engenious Systems, Inc.